Course Overview
Operating authorities are obligated to follow the requirements of the MECPs Watermain Disinfection Procedure with respect to the commissioning of new watermains. This course will familiarize participants with the minimum disinfection and sampling requirements outlined in the procedure.
Material will address the commissioning process from pre-project planning, construction, disinfection and final connections.
Target Audience
This course is directed to new and experienced distribution operators and contractor personnel involved with new watermain commissioning.
Delivery Methods Possible
Classroom, On Site, Virtual
Visit our course registration page for our upcoming course schedule!